FREE SHIPPING ON ALL ORDERS OVER $50.00.
Previous
imageGoveeLife Smart Humidifiers for Bedroom 6L Cool Mist Top Fill for Large Room Humidity Sensor Auto Mode 60H Quiet Runtime Schedule WiFi Humidifier for Baby Plant Compatible with Alexa BlackBlack

GoveeLife Smart Humidifiers for Bedroom, 6L Cool Mist Top Fill for Large Room, Humidity Sensor, Auto Mode, 60H Quiet Runtime, Schedule, WiFi Humidifier for Baby Plant, Compatible with Alexa, Black(Black)

Original price was: $79.99.Current price is: $47.99.
Next

GoveeLife 2.0 WiFi Hygrometer Thermometer 3 Pack, Smart Humidity Temperature Sensor with App Notifications, 2-Year Free Data Storage Export, Temperature Humidity for Bedroom, Wine Cellar, Basements(3 Sensor)

Original price was: $74.99.Current price is: $44.99.
imageGoveeLife 20 WiFi Hygrometer Thermometer 3 Pack Smart Humidity Temperature Sensor with App Notifications 2Year Free Data Storage Export Temperature Humidity for Bedroom Wine Cellar Basements3 Sensor
imageGoveeLife Smart Humidifiers for Bedroom 6L Cool Mist Top Fill for Large Room Humidity Sensor Auto Mode 60H Quiet Runtime Schedule WiFi Humidifier for Baby Plant Compatible with Alexa BlackWhite

GoveeLife Smart Humidifiers for Bedroom, 6L Cool Mist Top Fill for Large Room, Humidity Sensor, Auto Mode, 60H Quiet Runtime, Schedule, WiFi Humidifier for Baby Plant, Compatible with Alexa, Black(White)

Original price was: $79.99.Current price is: $47.99.

GoveeLife Smart Humidifiers for Bedroom, 6L Cool Mist Top Fill for Large Room, Humidity Sensor, Auto Mode, 60H Quiet Runtime, Schedule, WiFi Humidifier for Baby Plant, Compatible with Alexa, Black(White)

Original price was: $79.99.Current price is: $47.99.

Hurry up! Flash Sale Ends Soon!
00
DAYS
00
HOURS
00
MINS
00
SECS
SKU: 17491786827456 Category:
Trust Badge Image

Description

Smart APP & Voice Control: Through app control and Alexa or Google Home voice control for seamless operation, quickly keep your home comfortable. The LED display allows real-time monitoring of indoor humidity, making it a smart choice for bedrooms. Supports 2.4GHz Wi-Fi networks only.
Auto Mode: Features a built-in high-precision sensor capable of adjusting humidity more accurately than other humidifiers, bringing humidification to the next level. Pair with GoveeLife Thermo-hygrometer for an expanded range. (Thermo-hygrometer not included.)
All-Day Quiet: Operating at as low as 28dB, you can enjoy restful sleep without disturbance. Add your favorite essence to create a relaxing atmosphere, and fill your bedroom with your favorite fragrance.
Fast & Effective Humidification: The 350ml/h max mist output can cover an area of 600 ft² effectively combating dryness in large rooms. Direct the mist in any direction using the 360° dual rotating nozzle. Perfect for nurseries and plants. (Make sure the humidifier is on a level surface)
6L Large Capacity &Top-Fill Design: The 6L water tank runs for up to 60 hours minimizing the frequency of water refills.The top-filling design allows you to fill the water tank without turning it over or spilling water. The water tank comes with a handle, which allows easy lifting for cleaning.(Do not fill the water into the mist tube)

Reviews

There are no reviews yet.

Be the first to review “GoveeLife Smart Humidifiers for Bedroom, 6L Cool Mist Top Fill for Large Room, Humidity Sensor, Auto Mode, 60H Quiet Runtime, Schedule, WiFi Humidifier for Baby Plant, Compatible with Alexa, Black(White)”

Your email address will not be published. Required fields are marked *

Shopping cart

1

Subtotal: $44.99

View cartCheckout